I Net Broadband
I Net Broadband
Speed You Can Trust
Quick Login Portals
Pay Bill Online
Customer Support +91 9836549222
Installation & Activation • Fast Local Turnaround

Service Delivery Policy

Standard operating procedures for optical fiber installation, hardware delivery, and service activation.

4 - 24 Hours
Standard Activation
100m Fiber
Armored Drop Cable
Live Speed Demo
On-Site Verification
99.9% Uptime
SLA Guarantee
Section 1

1. Scope of Service Delivery

As an Internet Service Provider (ISP), "Delivery" refers to the physical installation of optical drop fiber cables to the subscriber premises, configuration of the Optical Network Terminal (ONT / Wi-Fi Router), speed testing, and final electronic handover of active internet bandwidth.

Section 2

2. Installation & Activation Timelines

Service Category Feasibility Survey Installation & Activation ETA
Residential Fiber Broadband Within 2 to 4 Hours Within 4 to 24 Hours
Commercial / SME Broadband Within 2 to 4 Hours Within 12 to 24 Hours
Internet Leased Line (ILL) Within 4 Hours 1 to 3 Business Days (Dedicated Ring)
Point-to-Point (P2P) Dark Fiber Within 4 Hours 1 to 2 Business Days
Section 3

3. Standard Installation Package

  • Up to 100 meters of heavy-duty armored outdoor optical drop fiber from the nearest Distribution Point (DP) box.
  • Single-point internal optical wall-jack (Rosette box) termination and optical laser splicing.
  • Deployment and Wi-Fi configuration of the Gigabit Dual-Band ONT router.
  • Live demonstration of download and upload speed benchmark test on the customer's phone/laptop.
Section 4

4. Customer Handover & Acceptance

Upon successful installation and speed validation, the subscriber signs the digital/physical Installation Handover Slip. Subscription validity begins from the hour the port is activated and signal is verified.

Section 5

5. Premises Readiness & Safety Compliance

To ensure safe and optimal fiber installation, subscribers are requested to provide:

  • A standard uninterrupted 230V AC (5A/6A) power outlet located near the intended ONT router placement.
  • Necessary building access permissions, riser shaft access, or society right-of-way permissions for routing optical fiber cables.
  • A central, elevated interior location for the Wi-Fi router to achieve maximum 360-degree wireless coverage.
Section 6

6. Extra Fiber Length & Custom Routing

If an installation requires optical drop cable exceeding the complimentary 100-meter allowance due to complex premises architecture, additional heavy-duty fiber is billed at a nominal standard rate per meter with full transparent invoice recording. Our technicians strictly use certified low-loss single-mode (G.657.A2) bend-insensitive fiber.

Section 7

7. Address Shifting & Connection Relocation

Subscribers moving to a new residence or office within I Net Broadband's coverage territory (Alampur, Sankrail, Andul, Dhulagarh, Domjur, Shibpur) can request seamless connection relocation. Feasibility check and re-installation at the new premises is executed within 24 to 48 hours with existing subscription validity smoothly carried forward.

Need to Track Your Installation Request?

Contact our Field Dispatch Coordinator at +91 9836549222 or email [email protected] with your Booking Reference Number.

Same-Day Installation

Book your connection before 2:00 PM for priority same-day fiber installation in Howrah.

+91 9836549222
Rapid Fiber Deployment

Ready for Ultra-Fast Optical Fiber?

Get installed in as fast as 4 hours with free Gigabit dual-band router on select plans across Howrah.

+91 9836549222